At a key production site, a global contract manufacturer deployed Arch’s Action Manager to tackle high attrition rates on SMT lines. The pilot focused on enabling real-time detection and response to line-level issues, improving material utilization, and accelerating root cause resolution. Within the first week, the site saw a 12% reduction in attrition, translating to an estimated $65,000+ in annualized savings at one site, with plans for broader adoption already underway.
HIGHLIGHTS:
12%
Attrition reduction within the first week
$5K+
Per line monthly savings
$65K+
Per site annualized savings
- Real-time alerts for problem machines and component locations
- Action Manager integrated with existing factory infrastructure
- Pilot success expected to expand across additional lines and areas
The Challenge
High attrition on SMT lines was leading to excess material waste and lower production efficiency. Without real-time insights, the team struggled to identify patterns and implement timely corrective actions. Key operational challenges included:
- Excessive material loss due to unmonitored attrition
- No real-time alerting or visibility into line-level issues
- Manual bottleneck identification and delayed resolution
- Limited insight for planning future Continuous Improvement(CI) or predictive maintenance
The Arch Approach
To close the data-action gap, the customer piloted Action Manager, part of the Arch Platform, on two SMT lines using Fuji and ASM equipment. The pilot deployment featured:
- Use of the attrition module with a 0.3% threshold for event detection
- Targeted alerts delivered directly to operators for rapid response
- Real-time monitoring of machine and component-specific issues
- Cause and resolution tracking to enable future process improvement
- Integration with existing IT infrastructure to streamline reporting and analysis
Key Outcomes
Attrition Reduced by 12% in One Week
Guided, intelligent actions enabled immediate impact on the lines.
- ● Attrition reduction aligned with target of 0.3%
- ● Lower material waste and more stable production flow
- ● Triggered real-time interventions by on-the-floor operators
Measurable Cost Savings and Line Optimization
Early results highlighted the broader business case for scaling the solution.
- ● $5,500 per line in monthly savings projected across similar lines
- ● $65,000+ in annualized savings per site
- ● Improved machine performance without major hardware changes
Foundation for Broader Action Manager Expansion
The pilot success provided a replicable model for further deployments.
- ● Action Manager now planned for additional lines and production areas
- ● Data infrastructure enabled future CI and predictive maintenance strategies
- ● Strengthened collaboration between IT, ops, and engineering teams
Strategic Lessons
Reducing attrition doesn’t require overhauling equipment. It requires targeted, real-time guidance that empowers teams to act decisively.
Key takeaways include:
- Real-time alerts reduce material loss: Operators responded to issues before waste accumulated
- Pilot programs prove value fast: A one-week rollout yielded measurable savings
- Targeted thresholds drive action: A 0.3% attrition flag helped operators focus
- Integrated tools scale faster: Built-in compatibility supported rapid deployment
- Guided actions enable smarter production: Action Manager made improvement tangible and repeatable